The Pengfa Scaffolding Girder Coupler stands as a testament to the excellence in construction equipment manufacturing, proudly produced by an esteemed China-based manufacturer and supplier with a proven track record in the industry.
As a specialized manufacturer and leading supplier within China, this company has dedicated itself to crafting robust and reliable scaffolding couplers that not only adhere strictly to industry standards but also surpass them, thereby guaranteeing the unwavering safety and steadfast stability of scaffolding systems amidst the most demanding construction projects. Incorporating cutting-edge technology and employing superior materials, the Pengfa Scaffolding Girder Coupler undergoes meticulous precision engineering to ensure it delivers unparalleled performance and enduring durability. This meticulous attention to detail and commitment to quality make it an exceptionally suitable and highly favored choice for an extensive array of construction applications, ranging from modest residential builds to grand-scale commercial developments. Its ability to withstand heavy loads and harsh environmental conditions, coupled with its ease of installation and maintenance, further underscores its position as a superior product in the market.
Type: | Scaffolding Clamp | ||
Surface: | Zinc or Galvanized | ||
Process: | Forged or Pressed | ||
Double Clamp: | Swivel Clamp: | ||
Type: | British, American, Germany | Type: | British, American, Germany |
Size: | 48.3 mm | Size: | 48.3 mm |
Weight: | 0.97 – 1.48 KG | Weight: | 1.25 – 1.75 KG |
Putlog Clamp: | Girder Clamp: | ||
Type: | British, American, Germany | Type: | British, American, Germany |
Size: | 48.3 mm | Size: | 48.3 mm |
Weight: | 0.62 KG | Weight: | 0.62 KG |
Standard: | BS1139, EN 74, AS1576 | ||
Beside above sizes, we can also supply the special specification as 42mm, 50mm, 60mm, 63mm, 73mm, 89mm | |||
Surface Treatment: | Hot Dip Galvanized, Electro Galvanized (Silver colour and Gold colour), Self Colour | ||
Certificate: | BS1139, EN74, AS 1576, IS09001:2000, MPV, CE | ||
Package: | Wooden cases, plastic bags with steel trays, or per custom’s requirement. |
Different types of engineering construction necessitate the selection of various scaffolding applications.
Bridge support frames predominantly utilize bowl-buckle scaffolding, with portal scaffolding also being an option.
For the main structure construction of ground scaffolding, fastener scaffolding is most commonly employed, with the longitudinal spacing of scaffolding poles typically ranging from 1.2 to 1.8 meters.
The transverse spacing generally falls between 0.9 and 1.5 meters.
During the construction process, scaffolding offers great flexibility in use. Depending on specific construction requirements, it can be configured into different frame sizes, shapes, and capacities, including single and double rows of scaffolding, support frames, support columns, material lifting frames, climbing scaffolds, suspension scaffolds, and other functional construction equipment. Additionally, it can be utilized for constructing facilities, sheds, lighthouses, and other structures.
It is particularly suited for the erection of curved scaffolding and heavy-duty support frames.
Please contact us for more information
Year 2023 | Indonesia | 300 Tons | Shipyard project, ASTM A106 Gr B, SMLS pipe with Galvanized coating for shipbuilding project (CLT175) |
Year 2022 | Qatar | 457.7 Tons | Electric Pole project, API5L PSL 1 X65, ERW WELDED PIPE with Galvanized coating for Electric Pole project (SK167) |
Year 2022 | Singapore | 400 Tons | Singapore Construction Project, BS1139 Q235B Scaffolding tube, coupler, Steel plank and Ladder for construction engineering. (CLT088) |
Year 2020 | Spain | 500 Tons | Water Pipeline, EN10224 L235 ERW Steel pipe for Water Pipe, HDG Steel Pipe |
Year 2018 | Philippines | 700 Tons | Construction project, EN10219 S235JR/A36, Galvanized Square Rectangular Pipe for construction (CL068) |
Year 2018 | Australia | 500 Tons | Australia Tunnel Project, API 5L PSL1 X42, ERW Steel pipe with Hot dipped galvanized coating for Tunnel Project ( CLT225) |
Year 2018 | Korea | 1300 Tons | USA Guam Airport Project,ASTM A53 GrB, ERW pipe with Galvanized coating for Airport (SK162) |